POST-STORM GUIDANCE
COASTAL CONSTRUCTION CONTROL LINE
In response to an emergency created by the landfall of tropical systems, the Florida Department of Environmental Protection (DEP) may issue an Emergency Final Order (EFO) that waives specific rules and statutes to address the need for immediate response and recovery actions.
The DEP Division of Water Resource Management has developed the following table to provide property owners and local governments with a concise explanation of activities that are authorized seaward of the Coastal Construction Control Line (CCCL) under the EFO. Note that consultation with Floridaβs Fish and Wildlife Conservation Commission (FWC) may be required for activities conducted during marine turtle nesting season.
RECOVERY ACTIVITIES FOR PRIVATE PROPERTY OWNERS
Debris Removal β Private Property Owners
| Activity | Location | Permits Needed | Conditions |
| Storm debris, vessels, vegetation, and/or structural remains |
Debris on private property, either upland or on sandy beach |
Local authorization through EFO or emergency CCCL permit |
Beach compatible sand should be separated from the debris and kept on site prior to debris removal. Removed debris must be deposited landward of the CCCL. |
| Removal of storm generated debris on the beach |
Seaward of the Mean High-Water Line |
Local Authorization through EFO or emergency CCCL permit |
Can be performed by private land owners, but this activity is typically managed through the local government. |
Repairs to Non-Substantially Damaged Structures β Private Property Owners
| Activity | Location | Permits Needed | Conditions |
| Repairs to non-substantially damaged structures; securing structures temporarily; removal of safety hazards and prevention of further damage. |
Damaged structures seaward of the CCCL |
Local government authorization |
Activities authorized are for temporary measures or repairs to pre-storm conditions. |
| Repair or replacement of non-structural components of buildings/structures. |
Exterior glass windows/panels, roof sheathing, studs and walls. |
Local government authorization |
Glass visible from beach must be tinted (45% or less). Must comply with building codes and remain within footprint. |
| Repair or replacement of minor ancillary structures and service utilities associated with existing habitable structures. |
Access stairways, stair landings, and on-site utilities |
Local authorization through EFO or Emergency CCCL permit |
Must not exceed original footprint or size. |
Repairs to Substantially Damaged Structures β Private Property Owners
| Activity | Location | Permits Needed | Conditions |
| Repair of substantially damaged or destroyed structures |
Damaged structures seaward of the CCCL |
Emergency CCCL permit |
Permanent repair of foundations or rebuilding major structures. |
Sand Placement β Private Property Owners
| Activity | Location | Permits Needed | Conditions |
| Beach scraping |
Beaches and dunes |
NOT AUTHORIZED |
|
| Sand fill/dune restoration |
On private property, on dune and above mean high water |
Local authorization through EFO or emergency CCCL permit/field permit |
Return of sand or placement of compatible upland sand. Must be clean and debris-free. |
Public Access β Private Property Owners
| Activity | Location | Permits Needed | Conditions |
| Repair of surviving beach/dune walkovers |
Dune walkovers |
Local authorization through EFO or Emergency CCCL permit/field permit |
Must allow adjustment and stay within 10 ft seaward of dune line. |
| Replacement of damaged walkovers, decks, gazebos* |
Dune walkovers |
Emergency CCCL permit/field permit |
Reconstruction allowed with limits. Must adjust for shoreline changes and stay within 10 ft limit. |
Coastal Armoring β Private Property Owners
| Activity | Location | Permits Needed | Conditions |
| Repair of armoring components |
Bulkhead/seawall caps and tiebacks |
Local authorization through EFO |
Complies with Rule 62B-33.0051. |
| Replacement/reconstruction of damaged armoring |
Seawalls, bulkheads, revetments |
CCCL permit required |
Major reconstruction rules apply. |
| Temporary armoring |
Wood walls, sandbags |
Local authorization |
Must be removed within 60 days. |
| New permanent armoring |
Seawalls, revetments |
CCCL permit required |
Must meet full compliance rules. |
RECOVERY ACTIVITIES FOR LOCAL GOVERNMENTS, DEP, FDOT, AND UTILITIES
Debris Removal
| Activity | Location | Permits Needed | Conditions |
| Removal of debris, vessels, trash |
Waters, wetlands, uplands |
USACE Section 10 permit |
Sand separation required. |
| Removal on private property |
Upland or beach |
EFO |
Same debris handling rules apply. |
Sand Placement β Government
| Activity | Location | Permits Needed | Conditions |
| Sand fill/dune restoration |
Above mean high water |
EFO or CCCL permit |
Must be clean, compatible sand. |
| Beach scraping |
Beaches and dunes |
CCCL permit required |
Requires local request and assessment. |
Public Access β Government
| Activity | Location | Permits Needed | Conditions |
| Repair of utilities, roads, access points |
Seaward of CCCL |
EFO |
Must meet current codes and not exceed original footprint. |